mike/e2e/critical-path.spec.ts
QA Runner d4448fa834 test(e2e): select a real Claude model in LLM-gated specs (demo model is fork-only)
The 4 LLM-gated specs (chat-management rename/delete/project-assistant and
the critical-path project flow) selected a "Demo (no key needed)" model in
the ModelToggle. That model exists only in a fork's demo provider — upstream
ModelToggle.MODELS has no such entry — so on this repo, setting the
ANTHROPIC_API_KEY secret unskipped the specs and they then failed at the
model-selection step.

Fix:
- Replace the selectDemoModel helpers with selectClaudeModel, which picks
  "Claude Sonnet 4.6" (the cheapest Anthropic entry in ModelToggle.MODELS).
  With ANTHROPIC_API_KEY exported to the backend, userApiKeys.envApiKey()
  reports the claude provider as configured, so the model is available and
  the submit is not blocked by the ApiKeyMissingModal.
- critical-path Step 8: the canned-reply assertion getByText("Demo mode")
  becomes a presence + nonempty assertion on the assistant answer container
  (MarkdownContent's "div.prose.font-serif.text-gray-900", unique to
  assistant answer content) — deterministic against nondeterministic real
  LLM output, same 60s budget.
- Comments rewritten to describe the upstream reality: specs run only when
  ANTHROPIC_API_KEY is set (e2e/llm.ts), the backend uses the env key, and
  title generation resolves to claude-haiku-4-5 via resolveTitleModel.

Verified against a local prod-build stack (backend :3001, frontend :3002,
local Supabase + MinIO), only ANTHROPIC_API_KEY configured:
- keyless Playwright env: 23 passed / 4 skipped
- ANTHROPIC_API_KEY exported: 27 passed / 0 skipped (1.2m)
- npx tsc --noEmit clean

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-20 21:19:51 -07:00

181 lines
9.4 KiB
TypeScript

/**
* Critical path E2E tests:
* 1. Authenticated landing — /assistant loads correctly
* 2. Projects — create a project, upload a PDF, open the project assistant,
* send a message and verify a response begins streaming
*
* Prerequisite: auth.setup.ts has already saved the session to e2e/.auth/user.json
*/
import { test, expect, type Page } from "@playwright/test";
import { hasLlmKey, LLM_SKIP_REASON } from "./llm";
import path from "path";
const PDF_FIXTURE = path.join(__dirname, "fixtures/test.pdf");
/**
* Select a Claude model in the chat input's ModelToggle.
*
* This spec runs only when ANTHROPIC_API_KEY is set in the Playwright
* environment (test.skip(!hasLlmKey, ...) — e2e/llm.ts). The CI stack exports
* the same secret to the backend, whose key resolution (userApiKeys.ts
* envApiKey()) falls back to the ANTHROPIC_API_KEY env var, so the "claude"
* provider reports as configured and ModelToggle shows the Anthropic models as
* available. The default model (Gemini) has no key configured in CI, so a
* submit with it would be blocked by the ApiKeyMissingModal. We pick
* "Claude Sonnet 4.6" (the cheapest Anthropic entry in ModelToggle.MODELS) so
* the request streams a real response. The Radix DropdownMenu trigger's title
* is "Choose model" (current model available) or "API key missing for selected
* model" (default-Gemini case).
*/
const CLAUDE_MODEL_LABEL = "Claude Sonnet 4.6";
async function selectClaudeModel(page: Page) {
const trigger = page
.locator(
'button[title="Choose model"], button[title="API key missing for selected model"]',
)
.first();
await expect(trigger).toBeVisible({ timeout: 10_000 });
await trigger.click();
await page.getByRole("menuitem", { name: CLAUDE_MODEL_LABEL }).click();
// After selection the trigger label reflects the chosen model.
await expect(
page.getByRole("button", { name: CLAUDE_MODEL_LABEL }),
).toBeVisible({ timeout: 5_000 });
}
/* ─── Test 1: authenticated landing ─────────────────────────────────────── */
test("authenticated user lands on the assistant page", async ({ page }) => {
await page.goto("/assistant");
await expect(page).toHaveURL(/\/assistant/);
/* The InitialView renders a greeting heading */
await expect(page.locator("h1, h2").first()).toBeVisible({ timeout: 10_000 });
});
/* ─── Test 2: create project → upload PDF → chat ─────────────────────────── */
test("create project, upload PDF, ask a question and receive a response", async ({
page,
}) => {
test.skip(!hasLlmKey, LLM_SKIP_REASON);
/* This end-to-end flow (create + upload + navigate + chat) needs more than
the 30s default. The per-test `{ timeout }` option that test() accepts is
silently ignored by Playwright (that object only takes tag/annotation),
so set it here. */
test.setTimeout(120_000);
/* ── Step 1: navigate to projects ─────────────────────────────────────── */
await page.goto("/projects");
await expect(page).toHaveURL(/\/projects/);
/* ── Step 2: open the "New project" modal ────────────────────────────── */
/* The Plus icon button in the header has aria-label="New project" */
const createBtn = page.getByRole("button", { name: "New project" });
await expect(createBtn).toBeVisible({ timeout: 10_000 });
await createBtn.click();
/* ── Step 3: fill in the project name ─────────────────────────────────── */
const nameInput = page.getByPlaceholder("Project name");
await expect(nameInput).toBeVisible({ timeout: 5_000 });
const projectName = `E2E Test Project ${Date.now()}`;
await nameInput.fill(projectName);
/* ── Step 4: advance to "Add Documents" and upload a PDF ──────────────── */
/* NewProjectModal is a two-step wizard; the details step's primary action is
a plain "Next" and only the documents step carries the file input. */
await page.getByRole("button", { name: "Next", exact: true }).click();
const uploadBtn = page.getByRole("button", { name: /^Upload/ });
/* We need to trigger the hidden file input; intercept the chooser */
const fileChooserPromise = page.waitForEvent("filechooser");
await uploadBtn.click();
const fileChooser = await fileChooserPromise;
await fileChooser.setFiles(PDF_FIXTURE);
/* The button label should update to reflect the queued file */
await expect(
page.getByRole("button", { name: /^Upload \(1\)/ }),
).toBeVisible({ timeout: 5_000 });
/* ── Step 5: submit the form ──────────────────────────────────────────── */
/* The PDF upload runs inside NewProjectModal.handleSubmit
(await Promise.all([uploadProjectDocument(...)])) BEFORE onCreated fires,
so the "Creating…" button state can persist for many seconds while the
file uploads. ProjectsOverview.onCreated then router.push()es to the new
project page, so wait for that navigation (generously, to cover the
upload). */
await page.click('button[type="submit"]');
await page.waitForURL(/\/projects\/[^/]+$/, { timeout: 30_000 });
/* ── Step 6: open the project assistant ───────────────────────────────── */
/* We're already on /projects/[id] (Documents tab by default). The project
assistant is now a nested route, /projects/[id]/assistant. Navigate there
directly rather than clicking through the tab bar to avoid ambiguity with
the "Assistant" item in the sidebar nav. (The olp UI replaced the old
"+ Create New" text link with a PillButton reading "Create" —
ProjectAssistantTable empty state.) */
const projectUrl = page.url().split("?")[0];
const createNew = page.getByRole("button", { name: "Create", exact: true });
await page.goto(`${projectUrl}/assistant`);
/* The assistant tab shows a chat list. Click "Create" to open the chat
interface where the text input appears. */
await expect(createNew).toBeVisible({ timeout: 20_000 });
await createNew.click();
/* Navigates to /projects/{id}/assistant (new chat UI) */
await page.waitForURL(/\/projects\/.+\/assistant/, { timeout: 10_000 });
await page.waitForLoadState("networkidle", { timeout: 20_000 }).catch(() => {});
/* ── Step 7: select a Claude model, type a question, submit ───────────── */
const chatInput = page.getByPlaceholder("How can I help?");
await expect(chatInput).toBeVisible({ timeout: 10_000 });
/* The default Gemini model has no key configured, so submitting it would be
blocked by the ApiKeyMissingModal. Select a Claude model (backed by the
ANTHROPIC_API_KEY the backend reads from its environment) so the request
actually streams a response. */
await selectClaudeModel(page);
await chatInput.fill("What is this document about?");
/* This ChatInput submits on Enter (Shift+Enter inserts a newline). */
await chatInput.press("Enter");
/* ── Step 8: verify the assistant streams a response ─────────────────── */
/* With a real Claude model the reply content is nondeterministic, so assert
presence + nonempty rather than matching text. The assistant's answer
renders through MarkdownContent (message/MarkdownContent.tsx), whose
wrapper div carries "text-gray-900 … prose … font-serif" — a combination
unique to assistant answer content on this page (user messages render a
plain <p>, and the gray pre-response EventBlocks prose uses
text-gray-400). Its appearance with nonempty text proves the message was
sent, streamed, and rendered end-to-end.
The reply is preceded by a POST that persists the chat, a client-side
route change to /assistant/chat/<id>, and a real LLM round-trip; under
local-Supabase load that can outlast a 30s budget, so allow the same
headroom the rest of this flow gets. */
const assistantAnswer = page
.locator("div.prose.font-serif.text-gray-900")
.first();
await expect(assistantAnswer).toBeVisible({ timeout: 60_000 });
/* Nonempty streamed text (any non-whitespace character). */
await expect(assistantAnswer).toContainText(/\S/);
});
/* ─── Test 3: login-page redirect for unauthenticated users ──────────────── */
/* describe-scoped test.use so only this test runs without a stored session.
File-level test.use would wipe the storageState for all tests in this file. */
test.describe("unauthenticated", () => {
test.use({ storageState: { cookies: [], origins: [] } });
test("unauthenticated request to /assistant redirects to login", async ({
page,
}) => {
await page.goto("/assistant");
/* Auth check is client-side (Supabase getSession) — allow time for the
async check to resolve and for Next.js router.push to fire. */
await expect(page).toHaveURL(/\/login/, { timeout: 15_000 });
});
});