mirror of
https://github.com/factbook/factbook.json.git
synced 2026-07-13 20:22:11 +02:00
up json
This commit is contained in:
parent
6ed42bc0bc
commit
73c3ecf6cd
244 changed files with 6174 additions and 4561 deletions
|
|
@ -6,7 +6,7 @@
|
|||
},
|
||||
"Geography": {
|
||||
"Location": {
|
||||
"text": "Central Africa, east of Democratic Republic of the Congo"
|
||||
"text": "Central Africa, east of the Democratic Republic of the Congo, north of Burundi"
|
||||
},
|
||||
"Geographic coordinates": {
|
||||
"text": "2 00 S, 30 00 E"
|
||||
|
|
@ -32,7 +32,7 @@
|
|||
"total": {
|
||||
"text": "930 km"
|
||||
},
|
||||
"border countries (4)": {
|
||||
"border countries": {
|
||||
"text": "Burundi 315 km, Democratic Republic of the Congo 221 km, Tanzania 222 km, Uganda 172 km"
|
||||
}
|
||||
},
|
||||
|
|
@ -668,67 +668,67 @@
|
|||
},
|
||||
"Energy": {
|
||||
"Electricity - production": {
|
||||
"text": "300.2 million kWh (2011 est.)"
|
||||
"text": "310.2 million kWh (2012 est.)"
|
||||
},
|
||||
"Electricity - consumption": {
|
||||
"text": "352.2 million kWh (2011 est.)"
|
||||
"text": "365.5 million kWh (2012 est.)"
|
||||
},
|
||||
"Electricity - exports": {
|
||||
"text": "5 million kWh (2011 est.)"
|
||||
"text": "3 million kWh (2012 est.)"
|
||||
},
|
||||
"Electricity - imports": {
|
||||
"text": "78 million kWh (2011 est.)"
|
||||
"text": "80 million kWh (2012 est.)"
|
||||
},
|
||||
"Electricity - installed generating capacity": {
|
||||
"text": "684,000 kW (2011 est.)"
|
||||
"text": "99,000 kW (2012 est.)"
|
||||
},
|
||||
"Electricity - from fossil fuels": {
|
||||
"text": "39.9% of total installed capacity (2011 est.)"
|
||||
"text": "34.3% of total installed capacity (2012 est.)"
|
||||
},
|
||||
"Electricity - from nuclear fuels": {
|
||||
"text": "0% of total installed capacity (2011 est.)"
|
||||
"text": "0% of total installed capacity (2012 est.)"
|
||||
},
|
||||
"Electricity - from hydroelectric plants": {
|
||||
"text": "59.8% of total installed capacity (2011 est.)"
|
||||
"text": "65.7% of total installed capacity (2012 est.)"
|
||||
},
|
||||
"Electricity - from other renewable sources": {
|
||||
"text": "0.3% of total installed capacity (2011 est.)"
|
||||
"text": "0% of total installed capacity (2012 est.)"
|
||||
},
|
||||
"Crude oil - production": {
|
||||
"text": "10 bbl/day (2013 est.)"
|
||||
"text": "0 bbl/day (2014 est.)"
|
||||
},
|
||||
"Crude oil - exports": {
|
||||
"text": "0 bbl/day (2010 est.)"
|
||||
"text": "0 bbl/day (2012 est.)"
|
||||
},
|
||||
"Crude oil - imports": {
|
||||
"text": "0 bbl/day (2010 est.)"
|
||||
"text": "0 bbl/day (2012 est.)"
|
||||
},
|
||||
"Crude oil - proved reserves": {
|
||||
"text": "0 bbl (1 January 2014 est.)"
|
||||
"text": "0 bbl (1 January 2015 est.)"
|
||||
},
|
||||
"Refined petroleum products - production": {
|
||||
"text": "0 bbl/day (2010 est.)"
|
||||
"text": "0 bbl/day (2012 est.)"
|
||||
},
|
||||
"Refined petroleum products - consumption": {
|
||||
"text": "5,320 bbl/day (2013 est.)"
|
||||
"text": "5,300 bbl/day (2013 est.)"
|
||||
},
|
||||
"Refined petroleum products - exports": {
|
||||
"text": "0 bbl/day (2010 est.)"
|
||||
"text": "0 bbl/day (2012 est.)"
|
||||
},
|
||||
"Refined petroleum products - imports": {
|
||||
"text": "5,302 bbl/day (2010 est.)"
|
||||
"text": "5,302 bbl/day (2012 est.)"
|
||||
},
|
||||
"Natural gas - production": {
|
||||
"text": "0 cu m (2012 est.)"
|
||||
"text": "0 cu m (2013 est.)"
|
||||
},
|
||||
"Natural gas - consumption": {
|
||||
"text": "0 cu m (2012 est.)"
|
||||
"text": "0 cu m (2013 est.)"
|
||||
},
|
||||
"Natural gas - exports": {
|
||||
"text": "0 cu m (2012 est.)"
|
||||
"text": "0 cu m (2013 est.)"
|
||||
},
|
||||
"Natural gas - imports": {
|
||||
"text": "0 cu m (2012 est.)"
|
||||
"text": "0 cu m (2013 est.)"
|
||||
},
|
||||
"Natural gas - proved reserves": {
|
||||
"text": "56.63 billion cu m (1 January 2014 est.)"
|
||||
|
|
@ -875,8 +875,8 @@
|
|||
"text": "Burundi and Rwanda dispute two sq km (0.8 sq mi) of Sabanerwa, a farmed area in the Rukurazi Valley where the Akanyaru/Kanyaru River shifted its course southward after heavy rains in 1965; fighting among ethnic groups - loosely associated political rebels, armed gangs, and various government forces in Great Lakes region transcending the boundaries of Burundi, Democratic Republic of the Congo (DROC), Rwanda, and Uganda - abated substantially from a decade ago due largely to UN peacekeeping, international mediation, and efforts by local governments to create civil societies; nonetheless, 57,000 Rwandan refugees still reside in 21 African states, including Zambia, Gabon, and 20,000 who fled to Burundi in 2005 and 2006 to escape drought and recriminations from traditional courts investigating the 1994 massacres; the 2005 DROC and Rwanda border verification mechanism to stem rebel actions on both sides of the border remains in place"
|
||||
},
|
||||
"Refugees and internally displaced persons": {
|
||||
"refugees (country of origin)": {
|
||||
"text": "73,915 (Democratic Republic of the Congo); 69,408 (Burundi) (2015)"
|
||||
"70179refugees (country of origin)": {
|
||||
"text": "74,054 (Democratic Republic of the Congo); 70,335 (Burundi) (2015)"
|
||||
},
|
||||
"IDPs": {
|
||||
"text": "undetermined (fighting between government and insurgency in 1998-99; returning refugees) (2012)"
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue