SurfSense/plans/backend
CREDO23 7a38614e07 docs(plans): record as-built state + re-runnable verification for Phase 2 (backend rename)
Add a top status banner (SHIPPED, branch/PR, phase tip commit) and an
Implementation record (deviations, carve-outs as-shipped, re-runnable
verification gates, deploy caveats) to 02-rename-backend.md.
2026-06-27 22:24:41 +02:00
..
00-umbrella-plan.md feat: backend plans drafts 2026-06-25 02:58:58 -07:00
01-rename-db.md docs(plans): record as-built state + re-runnable verification for Phase 1 (DB rename) 2026-06-27 22:24:41 +02:00
02-rename-backend.md docs(plans): record as-built state + re-runnable verification for Phase 2 (backend rename) 2026-06-27 22:24:41 +02:00
03a-crawler-core.md feat: backend plans drafts 2026-06-25 02:58:58 -07:00
03b-proxy-expansion.md feat: plans till phase 3 2026-06-24 21:07:08 -07:00
03c-crawl-billing.md feat: backend plans drafts 2026-06-25 02:58:58 -07:00
03d-captcha-solving.md feat: added phase 4 2026-06-24 23:07:08 -07:00
04a-connector-category.md chore: synced plans 2026-06-25 23:40:34 -07:00
04b-source-discovery.md chore: synced plans 2026-06-25 23:40:34 -07:00
05-pipelines-model.md chore: synced plans 2026-06-25 23:40:34 -07:00
06-pipelines-exec.md feat: backend plans drafts 2026-06-25 02:58:58 -07:00
07-upload-pipeline-kb.md feat: backend plans drafts 2026-06-25 02:58:58 -07:00